0215_NWS_ETS-L-WeatherEelRiver199

Caltrans employees Trevor Goff, left, Tim Hackett, and Isral Konopa look at the Eel River shortly before it reached official flood stage at Fernbridge on Thursday afternoon. They also checked on rock slope protection work that was done on the south end of the bridge in 2017 after erosion problems were noticed. (Shaun Walker — The Times-Standard)